Overview

The Transportation Manager (TM) Load Pro-Ration module will allocate costs incurred at the load and stop levels to each of the shipment legs attached to the load or stop.

See Also

Load Pro-Ration

Use pro-rated costs

Persist pro-rated costs

Establish Weight, Volume, Pallets and Pro-ration strategy

Identify distances

Extend by distance

Assign percentages to each shipment leg

Assess pro-ration requirements

Background information for charge details for loads

Pro-rate charges at load level or stop level

Adjustments for rounding