The Transportation Manager (TM) Load Pro-Ration module will allocate costs incurred at the load and stop levels to each of the shipment legs attached to the load or stop.
See Also
Load Pro-Ration
Use pro-rated costs
Persist pro-rated costs
Establish Weight, Volume, Pallets and Pro-ration strategy
Identify distances
Extend by distance
Assign percentages to each shipment leg
Assess pro-ration requirements
Background information for charge details for loads
Pro-rate charges at load level or stop level
Adjustments for rounding