Set a load to planned status – Load Build Control (Employee)

  1. Display the Load Build Control screen (Employee).
  2. Click Set To Planned under Load Operations. The Set Attached Loads to Planned screen is displayed.
  3. Enter the required information.
  4. Click Submit.

See Also

Set Attached Loads to Planned Status (Employee)

Load Gross Margin (Employee)

Set a load to planned status – attached loads (Employee)