Set Attached Loads to Planned Status (Employee)

Use this page to set to planned status for all loads that meet the designated selection criteria.

If necessary, Routing, Rating and Scheduling will be performed for each load that satisfies the selection criteria. Loads must be successfully Routed, Rated and Scheduled before they will be set to planned status.

Note: When the Maintain Load Gross Margin flag in the System Settings is enabled, this screen displays an additional section that permits user to select loads based on the relationship between desired gross margin and anticipated gross margin for the load.

Task

Set a load to planned status – Load Build Control (Employee)

See Also

Advanced Search Criteria

Load Build Control (Employee)

Maintain Load Gross Margin

Load Merge-in-Transit Consolidation Class

Reference Numbers section on Search pages

Search screens