Set a load to planned status – attached loads (Employee)

  1. Display the list of loads attached to a plan (Employee).
  2. Select a load.
  3. Click Set To Planned.

See Also

List of Loads Attached to a Plan (Employee)

Set a load to planned status – Load Build Control (Employee)