Remove the load merge-in-transit consolidation class for a shipment leg (Employee)
From the Transportation Manager Web user interface:
Perform one of the following tasks:
Click Load Build > Work with Plan > Shipments > Unassigned.
Click Load Build > Work with Plan > Shipments > Selected for Optimization.
Click Load Build > Work with Plan > Shipments > Optimized.
Click Load Build > Work with Plan > Shipments > Assigned to Load.
Click Load Build > Shipments Not Attached.
Click Load Build > Work with Plan > Loads. The List of Loads Attached to Plan is displayed. Select a load. Click Shipments. The Assigned Shipments tab is displayed. Click the Unassigned Shipments tab.
Click Load Build > Work with Plan > Loads. Select a load, then click Shipments.
Click Load Build > Loads Not Attached. Select a load, then click Shipments.
Click Load Processing > Trips. Select a trip, then click Loads. Select a load, then click Shipments.
Click Load Processing > Trips. Select a trip, then click Loads. Select a load, then click Shipments. Select a shipment leg, then click Assign Shipments to Load.
Click Load Processing > Loads. Select a load, then click Shipments.
Click Load Processing > Loads. Select a load, then click Shipments. Select a shipment leg, then click Assign Shipments to Load.
Click Load Processing > Shipment Legs. Select a shipment leg.