Swap Dock Commitments (Carrier)

This operation will allow the user to swap the dates/times and dock IDs associated with two different dock commitments.

While exactly two dock commitments must be specified when the Submit button is pressed from the Swap Dock Commitments screen, when the operation is selected from a list or from the Dock Commitments Gant Chart, anywhere between zero and two docks commitments can be selected.

The Swap operation will be allowed for dock commitments associated with a load that is currently being optimized. However, if the Swap operation is performed, any proposed updates to the corresponding load suggested by Optimizer will be discarded during the write-back process.