Remove shipment legs from a load

Shipment legs can be removed from a load using the Load Build, Load Processing, Load Confirmation modules, and Transportation Smartbench.

As with all operations that can be triggered from the Transportation Manager web UI or Smartbench, the administrator can determine which users, if any, should be authorized to remove shipments from loads from any of these modules.

Depending on system configuration, user may be prompted to provide a reason code when removing a shipment leg from a planned load via Load Processing, Load Confirmation, or Smartbench. Reason Codes will never be required when a shipment leg is removed via the Load Build module since the removal of a shipment leg from a load in Open status would be considered an expected action rather than an exception.

Validation

For a shipment leg to be eligible, it must meet the following requirements:

For a load in Planned, Tendered, Tender Accepted, Tender Rejected, Confirming or In Transit Operational Status to be eligible to have a shipment leg removed for a load that is not in Open status, it must meet the following requirements:

Note: Unlike the rules governing the assignment of shipment legs to loads, there are no restrictions that will prevent a shipment leg from being removed from a load that is being re-planned (optimizer) or is engaged in the carrier sequential tendering process. Since removal of a shipment leg could be required based on a shipment update triggered from an external system even while the associated loads are undergoing re-planning or carrier sequential tendering, the Transportation Manager web UI and Smartbench also allows shipment legs to be removed when the corresponding load is engaged in either of these processes.

Updates

When both load and shipment leg meet validation requirements listed above:

Note: Shipment Leg Removed from Planned Load will be a shipment leg level operation that may trigger load level background events. The Reason Code supplied by the user (if enabled) will be carried only to shipment leg level event data and messages. Secondary load level events generated by the operation will be assigned system-defined Reason Codes.

Note: If the Tender Cancel, Load Confirm or Set Load to Complete operations are triggered indirectly when the last shipment leg is removed from a load, the events associated with those operations will also be generated.

See Also

List of Shipments Assigned to a Load (Employee)

List of Shipments Picked at a Stop (Carrier)

Assign shipment legs to a load