If the load is suspended, the CST process will also be suspended. After the load is unsuspended, the CST process can either be resumed or re-started. The user should choose the option based on the circumstances.
For example: If the composition of the load has changed significantly, it might be advisable to re-start the CST process for the load; if changes are minimal, it might be more appropriate to resume the CST process.