Assign loads to new trip - Validation

The following validation are performed to verify the eligibility of the designated loads:

Loads are allowed to be manually assigned to a trip even when the Eligible for Continuation flag for the load is False. The Eligible for Continuation flag for the load will be used by the Optimizer to determine if load should be considered during trip creation / extension strategies.

If validation fails for any reason (for example, one of the selected loads is already attached to a trip, the trip will not be created.

See Also

List of Loads Attached to a Plan (Employee)

Loads In Process (Employee)

List of Trips (Employee)