Collapse itinerary for shipments – Load Build Control (Employee)

  1. Click Load Build > Work with Plan > Control. The Load Build Control screen is displayed.
  2. Click Collapse Itinerary under Shipment Operations. The Select Shipments for Optimization screen is displayed.
  3. Indicate whether to Collapse Last Leg or Collapse All Legs. Also enter the applicable filter criteria.
  4. Click Submit. A message indicates the number of shipments for which the operation was successful and the number of shipments for which it failed.

See Also

Collapse Itinerary for Shipments (Employee)

Collapse Itinerary (Employee)

Collapse Itinerary – Details