Attach a shipment to a plan – List of Shipments (Employee)

  1. Click Load Build > Shipments Not Attached. The List of Shipments not Attached to a Plan is displayed.
  2. Select a shipment leg.
  3. Click Attach to Plan. The Attach Shipment Legs to Plan screen is displayed.
  4. Specify the target plan for this operation (that is, the load plan to which shipment legs is attached).
  5. Click Submit. If one shipment leg was selected, a message indicates if the operation was successful. If multiple shipment legs were selected, a message summarizes the results of the operations. The browser returns to the List of Shipments not Attached to a Plan.

See Also

Attach a shipment to a plan – Load Build Control (Employee)

Select a plan (Employee)

List of Shipments not Attached to a Plan (Employee)